Saturday, October 25, 2014

Bridge

 This tree was blown down during a winter storm.

 Most of the branches have been removed.

 Now cut into 5 M lengths and split in two. I then had to move the planks about two hundred meters to the stream.
the almost finished bridge. A mix of light rain and drizzle all day at 13 with light wind.
I was to the IODE breakfast in the morning and to the bridge project for a hour after lunch.

1 comment: