I cycled around the park, a stiff breeze blowing, 25-35 km/h.
I then cycled the trail to Winsloe, they are still removing the topsoil from this construction site.
The fall colours are at their peak, by next week the leaves will be coming down
Sunny with a high of 17.
Subscribe to:
Post Comments (Atom)
curious about the construction in Winsloe???? A sign was posted for a new robyn's donuts but this construction looks way to big for the same area, I don't know where this is?
ReplyDeleteCindy, it is just west of the Sherwood cemetery. It is the location for the new Government Highway garage.
ReplyDeleteTHE PICTURE OF TRAIL AND FALL COLOURS IS ONE OF THE BEST I've seen love it
ReplyDelete